Back to projects
residential projectcompleted

Swastik Vrindavan Residential Duplex

Vrindavan Yojna, Lucknow

The 3,600 sq. ft. G+1 duplex in Vrindavan Yojna combines an RCC column frame with exterior weather-shield paint, modular electrical wiring and Italian marble flooring. The brief brings structural planning and finish choices together across two residential levels.

Explore project photos and video
Swastik Vrindavan Residential Duplex in Vrindavan Yojna, Lucknow
completed project
Total Area3,600 Sq. Ft.
Project Budget₹85 Lakhs
Duration10 Months
Build Statuscompleted

Project case study

Project overview

A luxury G+1 residential duplex in Vrindavan Yojna featuring earthquake-resilient RCC column frames, exterior-grade weather-shield paint, modular electrical wiring, and polished Italian marble flooring.

Scope and coordination

Planning considerations

For a multi-level home, stair placement, room circulation, electrical routes and floor transitions are useful to resolve together while the drawings are being finalized. The stated scope identifies the frame and finish elements that shape this project.

Project note 01

Making two floors work as one home

The G+1 arrangement means that daily movement, privacy and room use need to be considered across both levels. The project description records an RCC column frame, modular electrical wiring, exterior weather-shield paint and Italian marble flooring. Together, these details span structure, services, the outer envelope and interior finishes. A clear plan helps keep the stair, room circulation and service routes aligned with the intended layout, while finish selections can be checked against thresholds and changes in floor level.

Project note 02

What to coordinate in the drawings

For a duplex, settle the room arrangement and stair position before fixing electrical points and final floor finishes. Confirm how plumbing and wiring travel between levels, where wet areas sit, and how external walls meet balconies or windows. The frame should be designed for the actual drawings and site information; a project summary alone cannot establish structural adequacy. For a similar home in Vrindavan Yojna, useful inputs for an initial discussion include plot dimensions, road access, number of floors, family room requirements and preferred finishes.

Project note 03

Practical points for the next project

When reviewing a duplex proposal, ask how the floor plans, stair details, structural drawings, plumbing routes and electrical layout fit together. Request clear material specifications and a written list of inclusions for both levels. A site-specific estimate should explain the measured construction area and payment stages, while any design revisions should be documented and priced before the related work proceeds.

Plan a similar project in Lucknow

Explore the relevant service scope and share your requirements for a project-specific quotation.